Skip to the content
  • Home
  • Shop
    • Playtime
    • Sleep
    • Mealtimes
    • Grooming
    • Walks
    • Outerwear
  • Our Story
  • Contact
  • Blog
  • Merch

Country/region

  • Australia (GBP £)
  • Austria (GBP £)
  • Belgium (GBP £)
  • Bulgaria (GBP £)
  • Canada (GBP £)
  • Croatia (GBP £)
  • Cyprus (GBP £)
  • Czechia (GBP £)
  • Denmark (GBP £)
  • Estonia (GBP £)
  • Finland (GBP £)
  • France (GBP £)
  • Germany (GBP £)
  • Greece (GBP £)
  • Hong Kong SAR (GBP £)
  • Hungary (GBP £)
  • Ireland (GBP £)
  • Israel (GBP £)
  • Italy (GBP £)
  • Japan (GBP £)
  • Latvia (GBP £)
  • Lithuania (GBP £)
  • Luxembourg (GBP £)
  • Malaysia (GBP £)
  • Malta (GBP £)
  • Netherlands (GBP £)
  • New Zealand (GBP £)
  • Norway (GBP £)
  • Poland (GBP £)
  • Portugal (GBP £)
  • Romania (GBP £)
  • Singapore (GBP £)
  • Slovakia (GBP £)
  • Slovenia (GBP £)
  • South Korea (GBP £)
  • Spain (GBP £)
  • Sweden (GBP £)
  • Switzerland (GBP £)
  • United Arab Emirates (GBP £)
  • United Kingdom (GBP £)
  • United States (GBP £)
Trendy Mutt
Open mini cart
Open mini cart
  • Home
  • Shop
    • Playtime
    • Sleep
    • Mealtimes
    • Grooming
    • Walks
    • Outerwear
  • Our Story
  • Contact
  • Blog
  • Merch
    Home » Long Lead with Soft Handle

    Long Lead with Soft Handle

    Trendy Mutt

    Limited time offer

    In stock
    Usually ships within 24 hours
    Regular price £17.99
    Color
    Size
     
     

    Quality Assurance

    Friendly support

    Hassle-free returns

    Payment details

    • American Express
    • Apple Pay
    • Diners Club
    • Discover
    • Google Pay
    • Klarna
    • Maestro
    • Mastercard
    • PayPal
    • Shop Pay
    • Union Pay
    • Visa

    We accept all major payment methods for a smooth checkout experience.

    Long Lead with Soft Handle

    Tired of choosing between giving your dog freedom and keeping them safely under control? The Trendy Mutt Long Lead with Soft Handle gives your dog more space to explore while providing strength, comfort, and confidence on every walk.

    Made with reinforced nylon and a padded ergonomic handle, it offers multiple length options for training, hiking, and relaxed walks.

    ⭐ Why It’s a Trendy Mutt Favourite

    🐾 Heavy-duty reinforced nylon

    🐾 Soft padded ergonomic handle

    🐾 Multiple length choices

    🐾 Great for recall training

    🐾 Suitable for all dog sizes

    Give your dog freedom to sniff and explore safely with the Long Lead with Soft Handle.

    🐾 Add to Cart today and enjoy free delivery options, fast 48-hour dispatch (Monday–Friday), and our Satisfaction Guarantee.

    Please use all products responsibly and follow these simple safety guidelines:

    ✓ Always supervise your dog when using a new toy, accessory, or grooming product.

    ✓ Check products regularly for signs of wear or damage and replace them if necessary.

    ✓ Choose products that are suitable for your dog's size, age, and play style.

    ✓ Follow the care and usage instructions supplied with each product.

    ✓ If using grooming products, avoid contact with your dog's eyes, nose, mouth, and broken skin.

    ✓ If your dog shows any signs of irritation or discomfort, stop using the product and consult your veterinarian if needed.

    ✓ Keep all products out of the reach of children when not in use.

    ✓ Read any product-specific instructions or warnings before use, as care and safety guidance may vary between products.

    ✓ Free UK shipping

    ✓ Estimated delivery: 7–14 business days

    ✓ Tracking provided once dispatched

    ✓ Friendly support if you need us

    The Trendy Mutt Edit

    Thoughtful stories, fresh ideas, unexpected finds, and a few exclusive extras, for people who simply love dogs.

    Trendy Mutt is all about celebrating life with dogs. Inspired by the joy they bring to every day.

    The company operates under (Sandison & Finch Ltd), which is registered in the UK.

    Address: 124 City Road
    London, UK
    EC1V 2NX

    Company Registration Number: 17208954

    Popular categories

    • Mealtime
    • Playtime
    • Walks
    • Outerwear
    • Grooming
    • Sleep

    Useful links

    • About Us
    • Contact
    • Search
    • FAQ

    Need help?

    Whether you have a question about a product, your order, or just want to get in touch, we'd love to hear from you. Send us a message, and we'll get back to you as soon as we can.

    We aim to reply within 24 hours.

    Send us a message

    Country/region

    • Australia (GBP £)
    • Austria (GBP £)
    • Belgium (GBP £)
    • Bulgaria (GBP £)
    • Canada (GBP £)
    • Croatia (GBP £)
    • Cyprus (GBP £)
    • Czechia (GBP £)
    • Denmark (GBP £)
    • Estonia (GBP £)
    • Finland (GBP £)
    • France (GBP £)
    • Germany (GBP £)
    • Greece (GBP £)
    • Hong Kong SAR (GBP £)
    • Hungary (GBP £)
    • Ireland (GBP £)
    • Israel (GBP £)
    • Italy (GBP £)
    • Japan (GBP £)
    • Latvia (GBP £)
    • Lithuania (GBP £)
    • Luxembourg (GBP £)
    • Malaysia (GBP £)
    • Malta (GBP £)
    • Netherlands (GBP £)
    • New Zealand (GBP £)
    • Norway (GBP £)
    • Poland (GBP £)
    • Portugal (GBP £)
    • Romania (GBP £)
    • Singapore (GBP £)
    • Slovakia (GBP £)
    • Slovenia (GBP £)
    • South Korea (GBP £)
    • Spain (GBP £)
    • Sweden (GBP £)
    • Switzerland (GBP £)
    • United Arab Emirates (GBP £)
    • United Kingdom (GBP £)
    • United States (GBP £)
    © 2026, Trendy Mutt - Powered by Shopify
    Payment methods
    • American Express
    • Apple Pay
    • Diners Club
    • Discover
    • Google Pay
    • Klarna
    • Maestro
    • Mastercard
    • PayPal
    • Shop Pay
    • Union Pay
    • Visa

    Your cart

    Your cart is empty